Every rack, port and cable. One connected model.
Document your physical infrastructure in the browser. Know what's installed, where it connects and where the next deployment fits.
3D preview · sample data
Browser-based · CSV & XLSX import · Front & rear elevations · Excel export and JSON backup
What it does
01 · DOCUMENT
Rooms, rows and racks at true scale
Front and rear elevations with multi-U, half-depth and zero-U equipment, with placement checked on every add and move.
02 · CONNECT
Every cable, port to port
Fiber and copper documented end to end and traced through patch panels: connected, planned, one-ended or loose.
03 · PLAN
Find space before the pallets land
Contiguous RU, reserved units and rack policy checked up front. Every proposed placement waits for your approval.
01 · DOCUMENT
One model for the physical layer.
Every view in the product reads from the same record, from the site down to a single cable. Change it once and the elevation, the floor plan and the cable table agree.
| Level | Example | What is recorded |
|---|---|---|
| Site | DFW1 · Dallas | Location and the rooms it contains |
| Room | Production Data Hall A | Rows, floor plan and room capacity |
| Row | Row A | Rack order and position on the floor |
| Rack | A03 · 42U | Front and rear elevation, reserved units, utilization policy |
| Device | A03-SRV01 · U20 | Model, status, depth and ports |
| Port | A03-SRV01 / NIC1 | Type, side and the cable attached to it |
| Cable | NDS-CBL-000214 | Media, A endpoint, Z endpoint and the path through patch panels |
02 · CONNECT
Every cable, port to port.
Cabling is documented the way it is installed: A endpoint, patch field, Z endpoint. Select a cable to see its path.
- A and Z endpoints
- Every cable records both ends, port to port, with media, length and label.
- Through the patch field
- Paths run through front and rear patch-panel positions, including structured modules.
- Honest states
- Connected, planned, one-ended and loose cables are all first-class records.
- Disconnect without losing history
- A cable can be disconnected without deleting what was documented about it.
Trace any cable, end to end
Select a cable to see its documented physical path.
| Cable | A endpoint | Z endpoint |
|---|---|---|
| Connected | A03-SRV01 / NIC1 | B01-SW02 / Eth1/7 |
| Connected | A03-SRV02 / NIC1 | B01-SW02 / Eth1/8 |
| Connected | A03-STOR01 / CTRL-A | B01-SW02 / Eth1/15 |
| Connected | A03-SRV03 / MGMT1 | A03-MGMT01 / Gi1/0/3 |
| Planned | A03-SRV07 / NIC1 | B01-SW02 / Eth1/31 |
| One end only | A03-SW01 / Eth49 | Not yet terminated |
Physical path · NDS-CBL-000214 · Fiber · SMF
- A endpointA03-SRV01 / NIC1
- Patch panelA03-PP01 / 07 ⇄ B01-PP02 / 07
- Z endpointB01-SW02 / Eth1/7
03 · PLAN
Plan before you touch production.
The software proposes; the engineer approves. Nothing in the inventory changes until a person accepts the proposal.
- 01
Request
Catalog or custom equipment, quantity, and a network or compute zone preference.
- 02
Candidate
Placements are proposed across eligible racks in the room.
- 03
Validation
Rack bounds, installed equipment, reserved units and each rack's utilization policy.
- 04
Review
Proposed equipment appears dashed in the elevation, with explanations and warnings.
- 05
Decision
Accept revalidates and applies the whole proposal at once. Reject leaves inventory untouched. Or save it as a draft work order.
- Equipment
- 4 × Compute node, 2U
- Room
- Production Data Hall A
- Compute zone
- Lower
Proposal Awaiting review
5 of 5 checks passed
| Proposed device | Rack | Units |
|---|---|---|
| C04-SRV01 | C04 | U2–U3 |
| C04-SRV02 | C04 | U4–U5 |
| C04-SRV03 | C04 | U6–U7 |
| C04-SRV04 | C04 | U8–U9 |
- Within rack boundariesC04 · 42U
- No overlap with installed equipment0 conflicts
- Reserved units respectedU1 reserved
- Rack utilization policy31% after · limit 85%
- Compute zone preferenceLower · met
04 · PRODUCT
Every view, one model underneath.
Move through the same sample room as the product shows it: the site hierarchy, a rack elevation, Find Space, the floor plan and a spreadsheet import. These views are recreated from the product with sample data.
Sites and rooms
Site → room → row → rack, with available RU at every level.
| Site / room | Rows | Racks | Total RU | Available | RU used |
|---|---|---|---|---|---|
| DFW1 Dallas | 6 | 24 | 1035U | 683U | 34% |
| 3 | 12 | 519U | 330U | 36% | |
| Meet Me & Network Room | 2 | 8 | 348U | 253U | 27% |
| Lab Environment | 1 | 4 | 168U | 100U | 40% |
| NFD2 Northfield | 4 | 16 | 684U | 409U | 40% |
| Data Hall 1 | 3 | 12 | 516U | 288U | 44% |
| Network Room | 1 | 4 | 168U | 121U | 28% |
Every room links to its racks, rows and floor plan. Production Data Hall A opens the floor plan in this tour.
05 · BUILT FOR
Built for infrastructure engineers working at the physical layer.
For the teams responsible for what is physically installed, where it sits and how it connects.
Data center & infrastructure engineering
Rack, room and capacity records
Keep elevations, reserved units and available space accurate across sites and rooms, and plan deployments against them.Network infrastructure
Ports, patch panels and cables
Document every port and cable, including patch-panel positions, and trace a path from A endpoint to Z endpoint.Colocation operations
Space across rooms and rows
See occupied, reserved and available RU per rack, row and room, and find contiguous space before committing it.Deployment & implementation
Builds, work orders and verification
Import the build sheet, review proposed placements, track installs as work orders and verify racks against the record.
Built from real infrastructure work
“I've traced cables against elevation sheets that were out of date the day they were printed. This is built around how that work actually happens: rack by rack, port by port, with the record kept current as the work is done.”
06 · AVAILABILITY
What's in the product today, and what isn't.
Free during controlled early access. If it isn't in the left column, it isn't in the product yet; the right column is a statement of scope, not a schedule.
By invitation
- Sites, rooms, rows and racksModel
- Front and rear elevations, multi-U, half-depth and zero-U PDUsRacks
- Ports, patch panels, cables and physical pathsCabling
- A/B power feeds documented per PDU and devicePower
- Find Space, available blocks and reserved unitsCapacity
- Top-down floor plans with orientation and overlaysRooms
- Deployment planner with review, accept and rejectPlanning
- CSV / XLSX elevation import with editable previewImport
- Change history with undo and redoHistory
- Excel export, JSON backup, printable elevations, QR labelsOutput
- Work orders, rack verification and a phone view at the rackOperations
- Separate accounts and isolated workspacesAccess
Not in the product today
- 3D rack view in the app (previewed on this page)Views
- Live monitoring, telemetry or environmental sensorsMonitoring
- Electrical load and kW budgetingPower
- Public API and third-party integrationsIntegrations
- Single sign-on and self-service password recoveryAccess
- Paid plansPricing
EARLY ACCESS
Model your first room.
- Free during controlled early access
- No card required
- Join the waitlist for access updates